OHL SATO Portal -

  • Contact us
MENÚ
Cubipod
  • Sections
  • CUBIPOD
    • Characteristics
      • Structural robustness
      • Hydraulic stability
      • Easier to construct
      • Run-up and overtopping
      • Armor porosity
      • Economical
      • Sustainability
    • What is Cubipod?
    • Laboratory tests
      • Structural robustness
      • Hydraulic stability
      • 3D realistic placement
    • Awards
  • Services
    • About us?
    • Technical assistance
      • Pre-Design
      • Testing assistance
      • Planning the works
      • Construction
  • Design
    • Design mound breakwaters
    • Cubipod calculator
    • Overtopping
    • Forces exerted on the crown wall
  • Construction
    • Molds
    • Manufacture
    • Storage
    • Handling
    • Transport
    • Placement
  • References
    • San Andrés Breakwater - Port of Málaga
    • Naos Secondary Breakwater - Lanzarote
    • Langosteira I North and South Breakwaters - Port of A Coruña
    • Langosteira II West Breakwater - Port of A Coruña
    • La Esfinge Secondary Breakwater - Port of Las Palmas
    • Marine Bay d’Alger - Port of Alger
    • Western Breakwater -Port Expansion in Hanstholm
  • Documentation
    • Publications
    • Brochures
    • Manuals
It’s in:
  • Home > Uncategorized
Grupo OHLA
  • Follow us:
  • Facebook
  • Twitter
  • Yotube
  • Instagram
  • Torre Emperador. Paseo de la Castellana, 259 D - 28046 - Madrid
  • Legal Notice
  • Accessibility
  • Cookies policy
  • Web map