OHL SATO Portal - PLACEMENT OF CUBIPOD ARMOR UNITS IN SAN ANDRÉS BREAKWATER (PORT OF MALAGA, SPAIN)

  • Contact us
MENÚ
Cubipod
  • Sections
  • CUBIPOD
    • Characteristics
      • Structural robustness
      • Hydraulic stability
      • Easier to construct
      • Run-up and overtopping
      • Armor porosity
      • Economical
      • Sustainability
    • What is Cubipod?
    • Laboratory tests
      • Structural robustness
      • Hydraulic stability
      • 3D realistic placement
    • Awards
  • Services
    • About us?
    • Technical assistance
      • Pre-Design
      • Testing assistance
      • Planning the works
      • Construction
  • Design
    • Design mound breakwaters
    • Cubipod calculator
    • Overtopping
    • Forces exerted on the crown wall
  • Construction
    • Molds
    • Manufacture
    • Storage
    • Handling
    • Transport
    • Placement
  • References
    • San Andrés Breakwater - Port of Málaga
    • Naos Secondary Breakwater - Lanzarote
    • Langosteira I North and South Breakwaters - Port of A Coruña
    • Langosteira II West Breakwater - Port of A Coruña
    • La Esfinge Secondary Breakwater - Port of Las Palmas
    • Marine Bay d’Alger - Port of Alger
    • Western Breakwater -Port Expansion in Hanstholm
  • Documentation
    • Publications
    • Brochures
    • Manuals
It’s in:

PLACEMENT OF CUBIPOD ARMOR UNITS IN SAN ANDRÉS BREAKWATER (PORT OF MALAGA, SPAIN)

PLACEMENT OF CUBIPOD ARMOR UNITS IN SAN ANDRÉS BREAKWATER (PORT OF MALAGA, SPAIN)

Antonio Corredor, Moisés Santos, M. Esther Gómez-Martín and Josep R. Medina

Grupo OHLA
  • Follow us:
  • Facebook
  • Twitter
  • Yotube
  • Instagram
  • Torre Emperador. Paseo de la Castellana, 259 D - 28046 - Madrid
  • Legal Notice
  • Accessibility
  • Cookies policy
  • Web map